Macrohard
Largest hall
330,000
Musk: they have them
What the building names mean, how the Colossus 2 buildings fit together, and how fast and how densely they are built.
Six buildings in Memphis, TN and Southaven, MS. About 1.4 million chips by year-end, if every target is met. Updated Nov 2026.
Campus
Colossus 2
Largest hall
330,000
Musk: they have them
Training hall
220,000
Musk: they have them
Training hall
220,000
Musk: they have them
Training hall
220,000
Target: by Nov 30, 2026
Inference hall
~200,000
Target: December 2026
| Site | Where | Before | Floor area | GPUs | Chips | Status |
|---|---|---|---|---|---|---|
| Colossus 1 | Memphis, TN. 3231 Paul R. Lowry Rd | Electrolux appliance factory | ~785,000 sq ft | 230,000 | 150,000 H100, 50,000 H200, 30,000 GB200 | Running since 2024 |
| Macrohard | Memphis, TN. 5420 Tulane Rd | Logistics and distribution warehouse | ~1 million sq ft | 330,000 | 110,000 GB200, 220,000 GB300 | Retrofit began Feb 2025. Operating since Jan 2026 |
| Macroharder | Southaven, MS. 2400 Stateline Rd W | GXO Logistics warehouse | ~810,000 sq ft | 220,000 | GB300, for training | Conversion began Dec 2025 |
| Minihard | Memphis, TN. 5414 Tulane Rd | Purpose-built, four floors | ~312,000 sq ft | 220,000 | GB300, for training | Operating since Oct 2026 |
| Gun Range | Southaven, MS. Tulane Rd | Purpose-built, on a former police and fire training site | ~643,000 sq ft, two buildings | 220,000 | GB300, for training | Target: by Nov 30, 2026 |
| Spam | Southaven, MS. 2929 Stateline Rd W | Cold-storage warehouse that handled Hormel products | 53-acre site | ~200,000 | GB300, for inference | Target: December 2026 |
| All six | ~1,420,000 | 1.22 million Blackwell, 200,000 H100 and H200 | Year-end, if the targets are met |
Floor area is building size from public records and local reporting, and sources differ a little (Macrohard is given as 962,000 to just over 1 million sq ft). Spam’s figure is its site, not a floor plan. Gun Range replaces Southaven’s police and fire training center: the city announced a land swap with SpaceX affiliate MZX Tech in August, with 69 acres elsewhere and $40 million for new training facilities, and approved the data center plans on Sep 1. Mississippi’s environmental agency lists Spam as MZX Tech, LLC, SPAM, and issued construction stormwater coverage on Oct 16.
Training a model means hundreds of thousands of chips swapping results constantly, so the network matters as much as the chips. Musk says Gun Range will use 800 Gbps links, matching Macroharder and Minihard. Colossus 1 runs NVIDIA Spectrum-X Ethernet at 400 GbE.
Inference runs a finished model for users, and its chips can often work in smaller, independent groups. Musk says Spam needs less than half the fiber of SpaceX’s comparable training sites. That is not half the cost: chips, servers, power, cooling and buildings are still most of the spend.