SpaceX’s SI/AI data centers, explained

What the building names mean, how the Colossus 2 buildings fit together, and how fast and how densely they are built.

Colossus 2 and the buildings

Six buildings in Memphis, TN and Southaven, MS. About 1.4 million chips by year-end, if every target is met. Updated Nov 2026.

The words

Colossus 2 and the buildings

Campus

Colossus 2

Macrohard

Largest hall

330,000

GB200 + GB300

Musk: they have them

Macroharder

Training hall

220,000

GB300 · training

Musk: they have them

Minihard

Training hall

220,000

GB300 · training

Musk: they have them

Gun Range

Training hall

220,000

GB300 · training

Target: by Nov 30, 2026

Spam

Inference hall

~200,000

GB300 · inference

Target: December 2026

Building total~1.19M Blackwell
  • Training, GB300
  • Inference, GB300
  • GB300, role not given
  • GB200
  • Hatched = target, not done
The six buildings, side by side
SiteWhereBeforeFloor areaGPUsChipsStatus
Colossus 1Memphis, TN. 3231 Paul R. Lowry RdElectrolux appliance factory~785,000 sq ft230,000150,000 H100, 50,000 H200, 30,000 GB200Running since 2024
MacrohardMemphis, TN. 5420 Tulane RdLogistics and distribution warehouse~1 million sq ft330,000110,000 GB200, 220,000 GB300Retrofit began Feb 2025. Operating since Jan 2026
MacroharderSouthaven, MS. 2400 Stateline Rd WGXO Logistics warehouse~810,000 sq ft220,000GB300, for trainingConversion began Dec 2025
MinihardMemphis, TN. 5414 Tulane RdPurpose-built, four floors~312,000 sq ft220,000GB300, for trainingOperating since Oct 2026
Gun RangeSouthaven, MS. Tulane RdPurpose-built, on a former police and fire training site~643,000 sq ft, two buildings220,000GB300, for trainingTarget: by Nov 30, 2026
SpamSouthaven, MS. 2929 Stateline Rd WCold-storage warehouse that handled Hormel products53-acre site~200,000GB300, for inferenceTarget: December 2026
All six~1,420,0001.22 million Blackwell, 200,000 H100 and H200Year-end, if the targets are met

Floor area is building size from public records and local reporting, and sources differ a little (Macrohard is given as 962,000 to just over 1 million sq ft). Spam’s figure is its site, not a floor plan. Gun Range replaces Southaven’s police and fire training center: the city announced a land swap with SpaceX affiliate MZX Tech in August, with 69 acres elsewhere and $40 million for new training facilities, and approved the data center plans on Sep 1. Mississippi’s environmental agency lists Spam as MZX Tech, LLC, SPAM, and issued construction stormwater coverage on Oct 16.

Build speed, density and design

Days to bring a cluster online

Colossus 1, 2024122 days · 100K H100s · ~130 MW
Colossus 2, GB20091 days · 110K GB200s · ~210 MW
Colossus 2, GB30064 days · 110K GB300s · ~220 MW

Floor area for 220,000 GB300s

MacroharderConverted warehouse · ~810,000 sq ft
MinihardPurpose-built · ~312,000 sq ft

Minihard fits the same 220,000 GPUs into 61% less floor area, or 2.6 times as many GPUs per square foot of building. That compares building floor area, not data-hall density, and the other costs do not fall by the same share.